الانتقال إلى الصفة الترحيبية   Go To Welcome Page


 Fieldes Of Bussiness

The Mechanical and Electrical Field
 

Works on water Projects
 

Metal Structures and building of factories
 

Concrete and Structural Field
 
 


 

The Mechanical and Electrical Field

 

Installing the fodder silos for Zein Co in the port free zone in Tartous

Installing the fodder silos for Zein Co in the port free zone in Tartous. The silos were erected with the mechanical and electrical instruments after the necessary tunnels and bases were cast of the concrete.

  • The weigh of the iron used in construction is 150 tonnes.
  • Storage capacity is 24 thousand tonnes.

>> Detailed Photos ....

   

Carrying out the metal push lines

Carrying out the metal push lines (1500 mm dia) and 3600 meters long with connections of 5 pumping stations and installing the mechanical equipments for the lines in the project of The 16 October Dam in Lattakia.

  • The amount of the used tubes and the accessories: 2500 tonnes.
  • Duration of the contract: one year in 2002.

>> Detailed Photos ....

 

 
 
    Designed by Algadeer Co 2007.