The Mechanical and Electrical Field
 

Works on water Projects
 

Metal Structures and building of factories
 

Concrete and Structural Field
 
 


 

Metal Structures and building of factories

 

Building the metal coverage of the main platform for Basel Al-Assad stadium in Daraa

  • The square area of the coverage is 4000 square meters.
  • The quantity of metal and sheet iron : 500 tonnes.
  • Execution period: 6 months.

>> Detailed Photos ....

   

Setting up the two halls of the Arabic Co factory for irrigation by droplets

Setting up the two halls of the Arabic Co factory for irrigation by droplets in Hmeimem village, the square area of each is 2000 square meters in addition to the general location and the infrastructure of the plant.

>> Detailed Photos ....

   

Setting up the structural works for the warehouses and yards in Lattakia

  • Setting up the structural works for the warehouses and yards in Al-Hanady for Al-Zien Co: the five warehouses attained a total area of 15000 square meters, in addition to the total area of the yards and the infrastructure that reached 40000 square meters.

  • Setting up the structural works for the warehouses and yards in Al-Bassah for Al-Zien Co: there were two warehouses with a total area about 6000 square meters. The duration of execution was 4 months for each.

>> Detailed Photos ....

   

Setting up the structural works for Al-Waleed Co nutritional materials warehouse

Setting up the structural works for Al-Waleed Co nutritional materials warehouse in Al-Gharaf. Total area about 1000 square meters.

 

   

Studying and carrying out the support of the metal structure of the Syrian-Russian Co hall for Maintenance of Electric Transducers

Studying and carrying out the support of the metal structure of the Syrian-Russian Co hall for Maintenance of Electric Transducers in Lattakia, and erecting the metal structure of the bridge crane, in addition to preparing the design studies of the erect.

  • The total area of the hall attained 1000 square meters.
  • Execution period: 30 days.

>> Detailed Photos ....

 

 
 